Another week already?
Progress in the past week was much slower than in preceding weeks. This is due to two factors - 1 the nature of the main task (rigging) is by it's nature slow work for me. The other has been time devoted to another hobby (model trains) cut into my free time this week. This next week will be similar, mostly due to preparations for CINCYCON which is next weekend. I'll be hosting two games (ACW naval using Smoke on the Water and Mongoose Publishing's Starship Troopers). So time to work on the models will be somewhat limited.
With that out of the way, here's the progress from the last week.
That's all for now!
Progress in the past week was much slower than in preceding weeks. This is due to two factors - 1 the nature of the main task (rigging) is by it's nature slow work for me. The other has been time devoted to another hobby (model trains) cut into my free time this week. This next week will be similar, mostly due to preparations for CINCYCON which is next weekend. I'll be hosting two games (ACW naval using Smoke on the Water and Mongoose Publishing's Starship Troopers). So time to work on the models will be somewhat limited.
With that out of the way, here's the progress from the last week.
Rigging on the CSS Patrick Henry continues. Actually, the rigging is installed -painting is the next task! |
May have spoke too soon. The bowsprit needs another wire run to the foremast. |
Looking down on the CSS Thomas Jefferson. Armed with two pivot rifles. |
CSS Thomas Jefferson is getting there. four more wires to go! |
USS Pawnee is just getting started. |
USS Sassacus needs one more wire and then painting starts! |
That's all for now!